NPCI is building two 700MW pressurised heavy water reactors (PHWR), including Units 3 and 4 at Kakrapar, where there are two 220MW power plants. Officials say that in July, the fourth unit recorded 97.56% progress.

Wonder why they’re building these instead of thermal coal plants

  • Em Adespoton ( adespoton@lemmy.ca ) 
    link
    fedilink
    arrow-up
    40
    ·
    3 years ago

    The important bit:

    NPCI also plans to build a total of 16 700MW of nuclear plants at Rawatbhata, Rajasthan and Gorakhpur, Haryana.

    The Indian Government has further approved the construction of ten indigenously built PHWRs across the four states of Haryana, Rajasthan, Madhya Pradesh and Karnataka.

    The plan is to ramp up the present nuclear capacity from 7.48GW to 22.4GW by 2031.

  • roguetrick ( roguetrick@kbin.social ) 
    link
    fedilink
    arrow-up
    10
    ·
    edit-2
    3 years ago

    India likes CANDU based reactors like this because they don’t want to enrich uranium. They focus on plutonium production for their bombs and want to eventually create plutonium breeder reactors for a thorium fuel cycle.

    Edit: the fact that they natively breed tritium without a dedicated lithium channel is good for fusion or variable yield bomb initiators too.

  • dastardly ( dastardly@lemmy.ml ) 
    link
    fedilink
    arrow-up
    4
    ·
    3 years ago

    700MW isn’t much, but I see they plan to build 16 which is a bit more significant (2023 usage is 236.59 and rising). Are they planning to ramp up 15GW by 2031 using these planned plants? The math checks out on the generation, but it does not check out on the timeline. 2 more are reportedly largely complete, but on the other hand 10 have just received approval. These appear to mostly be similar designs, and for context this particular unit took three years from achieving criticality to supplying power.

    I have some other concerns/questions about the plan other than what appears to be an impossible timeline - like how well they’ve modeled the risk of local climate change on their cooling ponds. It’s not that nuclear is bad, I’m just wondering if the priorities were correctly evaluated here - or if things like corruption might be at play.