I built this from scratch, including the the wall framing, drywall, cusom mortar shower pan, and the hardwood floor insert. It was 98% complete here.
I built this from scratch, including the the wall framing, drywall, cusom mortar shower pan, and the hardwood floor insert. It was 98% complete here.
My deck gets real slippy when wet so I’m wondering if this will ne the same. Hopefully not but the sand is a great idea.