• huppakee ( huppakee@lemm.ee ) 
    link
    fedilink
    English
    arrow-up
    13
    ·
    2 years ago

    Major power facilities require power to operate, and there’s lots of unmet demand.

    Since the Iberian Peninsula lost power in a massive blackout, grid operators are in the process of trying to restore power to millions of customers and businesses. As you might imagine, the process—termed a “black start”—is quite a bit more challenging than flicking on a switch. However, the challenge is made considerably more difficult because nearly everything about the system—from the management hardware that remotely controls the performance of the grid to the power plants themselves—needs power to operate.

  • MudMan ( MudMan@fedia.io ) 
    link
    fedilink
    arrow-up
    12
    ·
    2 years ago

    Just because it’s only mentioned in some reposts, they had the grid back up and running at 100% in like six hours after this was published, so about 24 hours after the event itself (and it was at about 30%-50% when this was published already).

    I mean, I still think it’s interesting to learn about this, but I do think it’s fun how much more pessimistic the article’s estimate is than how this actually went down. It’d be interesting to see a follow up covering how they went about pulling that off.

  • It’s interesting, it’s kind of like starting a fire the old fashioned way, to get a big fire you start with embers, and in this case, it’s the smaller power plants getting operational, temporarily electrically powered by diesel generators, that supplies those embers in order for the bigger power plants to start.