minus-squareentropicdrift ( entropicdrift@lemmy.sdf.org ) linkfedilinkarrow-up4·10 months agoThe 4.1m was the budget for the front-end. The back-end changes were initially budgeted as 31m but tripled in cost as the project dragged on and contracts needed to be extended.